Overview
This project can draw bar charts as DIAdem has no such "out of the box" functionality.

Description
- First, the report (TDR) is loaded.
- The amounts are getting calculated.
- We "shift" those amounts along the y-axis, otherwise the bars would be behind each other. The value of each shift equals the sum of the previously calculated amounts. The total of all those shifts (or amounts) equals 1 (or 100%).
- Draw the bar chart.
Hardware and Software Requirements
DIAdem Base 2012 SP2 (or compatible)
Steps to Implement or Execute Code
1. Unzip Bar Chart - DIA2012SP2.zip
2. Run BarChart.VBS
Eric H.
Applications Engineering
National Instruments