03-31-2010 11:54 AM
Ronster wrote:Raven Fan,
You must be running in another world.
That may well be true, but the option is definitely there. Make sure you are signed in, go to your message incorrectly marked as the solution, click options, about halfway down is "Unmark as Accepted Solution".
03-31-2010 12:00 PM
03-31-2010 02:43 PM
Ronster,
Sorry I haven't gotten back to you..normal work has got me buried. I took a quick look at lunch and it looks like those scales are coming from Polar Plot Demo>>Polar Plot>>Draw Polar Grids>>PG scale.vi>>Draw Scale.vi. At this point I would (starting at top level) save all the vi's under different names an modify as needed. Sorry I can't be of more help at this time as I don't have LabVIEW available to me in this office. If you get a good solution please post it.
03-31-2010 02:58 PM
GovBob,
Don't know if that last reply went through or not. I have attached a copy of my success! You were correct about the scaling. I didn't bother to save it to another vi, since I couldn't stand that scaling with all of the horizontal lines across the data. I am currently in process of adjusting the start of the plot based on the time stamp from the data.