Hi
There's another
thread about chart history length. Maybe you want to look at it.
I would not set the history length to the maximum. Is it not possible to process your data as needed and instead of writing it to the chart build up an array which than can be passed to a graph-control?
Thomas
Using LV8.0
--------------------------------------------------------------------
Don't be afraid to rate a good answer... 😉
--------------------------------------------------------------------