Hi Ryan,
Thanks for your response. Is there a political or technical reason for this?
I thought that OPC AE connectivity would be the most fundamental thing in a HMI/SCADA system.
I have no possibility to read the internal controller alarms, events and trips on the SCADA system without altering the controller code to write them out to another interface (eg. Modbus).
I see it as a total waste of resources to have one interface for AE and another for DA.
Do you think this will change in the future? Your competitors offer AE.
Thanks,
Trev.