Motion Control and Motor Drives

cancel
Showing results for 
Search instead for 
Did you mean: 

Two processes running at the same time in Lookout

I have installed Lookout 5.0 with 200 I/O Points onto our server computer. The application of motion control is next to the 200 I/O points through OPC PMAC server/client. Now I would like to have a second process in the same server for trouble shooting and testing without stopping the motion control process. However, this second testing process could have also many I/O points through Serial and USB ports. I assume that the total amount of I/O points of both processes will be greater than 200.I prefer to have independent processes for control and testing because access levels. Can I have these two processes running at the same time when needed?
0 Kudos
Message 1 of 2
(2,907 Views)
Hi,

From your description you are using a third party OPC server for the motion application. You could have a second Lookout process communicating with the same OPC server with no problems, as long as you do not exceed the number of I/O points your license supports.

Also, the process you are using for testing obviously could not overwrite datamembers (or registers if you will) that would interfere in the overall application, in other words you can test your application as long as you keep the coherency of the test.

So the answer would be, yes it is possible, however you are still limited to the number of I/O's your license supports... You may even consider upgrade the number of I/O's you have in your license.

Best Regards

Andre Oliveira
Message 2 of 2
(2,907 Views)