NIYANTRA Documents

cancel
Showing results for 
Search instead for 
Did you mean: 

New NIYANTRA 2013 - rail flaw detector using labVIEW

(Make sure you follow all the 3 steps involved in submission. This is only Step 2 of 3. For details, visit http://bit.ly/16iNfUL)

 

Contact Information

 

Name of the College  :Dr.N.G.P.INSTITUTE OF TECHNOLOGY

 

Name of the Team Members along with their respective current semester :T.Hari Praveen Raj(5TH SEMESTER)
                                 Mokhanapriya.G(PASSED OUT)                                 Shobana.K(PASSED OUT)                                 Suganya.A(PASSED OUT)                                 Suja.S(PASSED OUT)

 

E-Mail Address & Phone Number of the Team Leader :haripraveenjabba@gmail.com/8903591571

 

Name of the Faculty Guide:Mrs.V.Priyadarshini  Asst.Prof.,Dr.N.G.P.IT

 

E-Mail Address & Phone Number of the Faculty Guide :drngpit@gmail.com/9865297768

 

 

Project Information

 

Project Title: rail flaw detector using labVIEW

 

 

Hardware & Software Used:

 

Hardware used:

 

PIC 16f877a  microcontroller,dc gear motor,led ldr,encoder ht12e ,decoder ht12d,serial 232,max 232,zigbee rf4ce,lead acid  battery , rf transmitter and reciver,

Software used:

lab VIEW,visa,hyperterminal

 

 

What challenge/problem are you trying to solve through your application:

To detect the flaws that occur on the railway tracks using a robot. When the robot detects the flaw, a message is sent to the control unit stating that a flaw has been detected and turns the railway signal red. Continue monitoring the railway tracks even when the trains functioning.
                            

 

How does your application solves the above mentioned challenge/problem:

 

 the flaws on the tracks are detected using a led ldr,the message is sent to the control unit and the signal is controlled by using rf transmitters,zigbee .

 

Description of Project:

 To detect the flaws that occur on the railway tracks using a robot. When the robot detects the flaw, a message is sent to the control unit stating that a flaw has been detected and turns the railway signal red. Continue monitoring the railway tracks even when the trains functioning.

 

 

 

 

Insert Images Here:


 

 

 

YouTube Link of Video:

 

http://youtu.be/EpkUNlyjWwc

 

Insert the Video here:

 


 



 




Contributors