Hello All!
I have two identical test cells with PC's, FP I/O modules and a DMM. They use the same test software, IAK files, etc, from the network (the FP I/O is connected to the PCs via a second NIC in the PC, and not over the plant network). Each cell uses an FP-DO-403 to control relays to route signals to DMM.
In one of the cells, I believe I'm having an occasional problem with more than one of the relays controlled by the DO-403 being closed at a time - basically backfeeding one measurement point to another. This has never been a problem with the other test cell.
Is there a way for me to test the DO-403 to see if it's turning it's outputs on, and especially off, in the time specified?
Thanks,
Mike