Using Lookout Direct v4.5.1.19. I have 2 radio buttons that need to work together. As they did from previous custom VB Win98 code. Each is a 3 position. 1st RPB: V2400=1 Manual, 2 Auto Lead, 3 Auto Lag. 2nd RPB: V2401=1 Manual, 2 Auto Lead, 3 Auto Lag.
PLC Automation Direct DL450. PLC logic as it relates to memory addresses 1st V2400=V10001 (manual), next rung V2400=V10002 (auto lead), next rung V2400=10003 (auto lag). 2nd V2401=V10001 (manual), next rung V2401=V10002 (auto lead), next rung V2401=10003 (auto lag).
When 1st Radio Button is in Auto Lead state (V2400=V10002). The 2nd Radio Button needs to automaticaly become Auto Lag (V2401=10003) without operater intervention. And visa-versa. If either is in Manual state, either one would be left in last state. Or until a selection of Auto Lead or Auto Lag is made that is opposite of last state.
Thanks,
Brad