12-02-2007 01:47 AM
Hi,
We have more than 150 tests should be applied to verify our product and we have big quantity to be tested in short period.
For this purpose I decided to test 4 UUT's at a time using suitable configuration. I have heart that Test Stand can meet the requirements and I have red TS help (batch & parallel test) but I get confused since I'm not expert in TS.
To make it clear I have:
*4 DMMs
* 4 set of switches and relays to apply 4 tests at a time.
* shared sources (AC PSU, DC PSU, FGen) that can feed 4 UUT at time.
What I'm looking for is:
Knowing the previous points what is the right way to apply my test?
Help me please.
Thanks
12-03-2007 05:49 PM
12-03-2007 11:56 PM
Thank you very much Andy for you supports.
Your information is very helpful and it encourages me to deeply go through Test Stand.
I would like to clarify the image here.
· 4 UUT to be tested at the same time.
· The test contains many main steps which include group of measuring points.
· Every main step consist of Two stages:
o 1st: setup and powering stage. (Shared for all 4 UUT)
o 2nd: Measurements stage. (each UUT has its own DMM and group of switches)
· The powering stage should be implemented at the beginning of each main step ones for all UUT.
· The measuring stage will be implemented for each UUT and for each measuring point till main stage terminate.
· When all UUT terminate the First main step, new main step starts with new setup and powering stage.
Could you please advice me what to do?
Thanks & Regards