During trouble-shooting with TestStand 2012 SP1, we encountered a situation where we are running a Batch Synchronization Step (either Serial or Only 1 Thread).  A step within the block gave a Error, so that thread jumped to Cleanup without running the Batch Synch Exit.  The other Exeutions then Errored due to the first not running the Batch Synch Exit, the Sequences never realigned at the next Batch Step.  Is there a way to prevent this from happening?

0 Kudos
Message 1 of 2
(4,351 Views)

Hey jhedr,

 

You could try setting a Post Action for the step that is failing. If look under the Properties tab for the step there will be an field titled "Post Actions". Here you can specify actions to take upon the step either passing or failing. For the "On Fail" case, you could specify to go to the Batch Synch Exit step, instead of going directly to Cleanup.

 