Does anyone know how to setup the NI Monitor to show the link scheduling time acquired from the fieldbus for "Time Measured" shown by the Monitor for each frame?
I just see Absolute, Idle, From Start, From End, Transmission, and PC Time as possible selections for "Time Measured," and from the descriptions in the manual none of these look like a time value taken from the bus data.
Thanks.