06-29-2010 08:40 PM
I'm using a number of pH meters that require daily calibration. I've been calibrating them in Max, which keeps a record of all calibration data. I'm also generating a report with all the pH values within my VI and I'd like to be able import that time stamped calibration record from Max in to LabVIEW so it can be input in to the same report. Is there anyway to import the calibration from a specific Max Task in to LabVIEW?
06-30-2010 05:24 AM