LabVIEW

cancel
Showing results for 
Search instead for 
Did you mean: 

Im a student having trouble with a Municipal Water Managment System Project......Help please !!!

What I meant by this step is that you could submit the Requirement Specs, and the Software Design Documents as part of your project.  That will impress the socks off your prof.

 

You could even add a button (or control portion) that mimics the weather.  Sunny = no rain, cloudy = rain.  You could go crazy and say sunny = evaporation, cloudy = no change, raining = more water, pouring rain = lots of water.

 

The only limit is your imagination.

0 Kudos
Message 61 of 77
(1,533 Views)

Haha 🙂 seeing as the project was meant to be tested tomorrow (not gonna happen) i think i'll keep it simple. Rain or no rain is enough....

 

Will this method have all the code in one sub vi and all the controls and alarms will be set in the event bit, not sure how it works but can see the possibilities.

0 Kudos
Message 62 of 77
(1,531 Views)

You need to finish this by tomorrow?  (you mean today?)

 

What I was going to propose would have a main vi and as many sub-vi's as there are features (functions).

If it's due tomorrow today, then that might change to a signle vi that does everything and is based on what I originally posted.

0 Kudos
Message 63 of 77
(1,473 Views)

I've already resigned to the fact it's not gonna be done for today 🙂 I've the report for it 3/4 finished which is 50% but have like 4 exams in 4 days to study for, next wed-fri, if it comes to it and i'm under pressure to hand it in next week i'll just give up what ever bits and pieces i've tried doing and hope to scrape a pass. 

 

I just can't get my head around the code.

0 Kudos
Message 64 of 77
(1,460 Views)
Ask for an extension.  This is a great opportunity to learn the proper way to code using LabVIEW.  😉
0 Kudos
Message 65 of 77
(1,424 Views)

Please tell me Ray wasn't too late with that last post Simone, It's been great to read this thread and watch the progress. I'd hate to see it stop because of a deadline.

 

I got lots of extensions for my projects when I was at Uni on various different grounds. You could be looking at a 20%+ increase in the project mark if you can get even a 3 day extension when you can focus on the project and not exams.

 

(alternatively how mauch weight does this project carry compared to 1 exam? you should weigh up the pros and cons. Many of my fellow engineers opted to scrape a pass in 1 module 6% of the year in favour of a better project which was 25% of the year. **I'm not advocating failing here.**)

 

James

CLD; LabVIEW since 8.0, Currently have LabVIEW 2015 SP1, 2018SP1 & 2020 installed
0 Kudos
Message 66 of 77
(1,413 Views)
Na not too late 🙂 the project is worth 3/4 of the marks in the year for one subject so i do sorta want to do it right but i'll see how long i'm left alone before it's asked for, then i just gotta hand it up... 😞 I'm flat out from now till sat evening then sorta have about three days where i could be working at it before i gotta start exam study again... aahhhhh 🙂 Any help is greatly appriciated... I CAN'T WAIT TO RELAX FOR THE SUMMER!!!
0 Kudos
Message 67 of 77
(1,393 Views)

relax in the summer??  ..... sigh .....

 

Don't give up.  With our help, you'll have the finest project ever.

Message 68 of 77
(1,376 Views)

Sorry for the delay....

 

Finally ready to give my full attention to this project, got nearly everything else sorted study and projects wise:)

 

I've been playing around with the tank simulators in LabVIEW and can get tanks linked up and filling from each other but they don't really suit what i was trying to do, any ideas on a starting point ? 

 

 

 

 

0 Kudos
Message 69 of 77
(1,299 Views)
Can you provide more details?
0 Kudos
Message 70 of 77
(1,267 Views)